Sunday, July 20, 2008

Time to Run the lines to the pumps


Ballast Install 007
Originally uploaded by gkemp
After everything set over night we started the assembly of hose to the pumps. Friday night we figured out where the pumps were going and how to tap into the electrical.

We ran the flex PVC from the manifold to the pumps. We used teflon tape on the ends of the pumps which helped with the connections. The manifold is right up to the floor which helps brace the overall structure.

No comments: