Sunday, July 20, 2008

Front bag Assembly


Ballast Install 032
Originally uploaded by gkemp
The front U bag took some more planning. We are filling from the top on the port side and from the bottom of the starboard side. I removed all of the vent hose and got rid of it. It wasn't doing much but getting in the way. We ran some multiflex though the hole the vent hose was in and fished it though on the first try to the other side. We mounted the pump on the port side because my Sub box was too big and was going to put the bag right on the pump. From the pump we ran a T so we can fill both sided of the bag at the same time. We fished the electical though the same vent hole to the other side. That was more trying and we used a fishing tool to get the wires pulled. On the Starboard side we put the vent on top of the bag and filled from the bottom. We found that the front cup holders have sharp nipples on the bottom of them so cut them off and filed them down and put some duct tape on the bottom to protect the bag. When the bag was full it popped the cup holders out and pushed up the front seat in the middle.

No comments: