Tige RZ2 Ballast Install
A detailed version of my ballast install
Sunday, July 20, 2008
Hole in the bottom of the boat
Ballast Install 084
Originally uploaded by
gkemp
This is the scoop assembly for the manifold. We used a 1 5/8" hole saw. The scoop is 1 1/4" scoop grate. From that I attached a 1 1/4" ball valve so I can shut the system off if there is a problem. After the ball valve it is PVC.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
▼
2008
(15)
▼
July
(15)
Lake Test
Front bag Assembly
Electrician at Work
Rear Bag Assembly
Time to Run the lines to the pumps
Hole in the bottom of the boat
More Holes in the boat
Drillig Holes into my Boat
Rear Seat Removal
Clean up and remove
Tent City Opened
Test Holes
Part List
Everything is ready just need my boat
Installing Ballast on my RZ2
No comments:
Post a Comment